Skip to content

Miami’s School Epoxy Flooring

School floors take the bell rush several times a day, then get wet-mopped, scrubbed and rolled over by carts. We put resinous floors in the spaces that wear out first, and we schedule the work around the school calendar. Firefighter owned in Miami, serving Miami-Dade, Broward, Palm Beach and the Keys.

Wear points

Thousands of Footsteps a Day

Class Change

When the bell rings, a whole corridor moves at once. Sand and grit from outside get ground into the floor along the same narrow paths every day.

Lunch Service

Spilled milk, dropped trays, and tables and benches dragged into place before and after every lunch period. Then the floor gets mopped wet.

Lab Spills

Science rooms see dyes, stains, acids and bases in small amounts. A porous floor keeps the evidence for years.

Restrooms

Water, urine and disinfectant every day. Tile grout and old vinyl seams hold odor that no mop takes out.

Calendar

From Board Approval to First Bell

01

Walk in Spring

We walk the buildings while school is in session, so we see how each space is really used, and we test the slabs.

02

Scope in Writing

A system per area, product data sheets and a phasing plan your facilities office can take to whoever approves it.

03

Summer Work

Once the buildings empty out, old flooring comes up and we grind, repair and coat area by area.

04

Cured Before Staff Return

Each area gets its full cure time, so teachers can move furniture back in and set up rooms on schedule.

Corridors Take the Worst of It

Hallways fail first because the traffic doesn’t spread out. Students walk the same lines from the doors to the stairs to the classrooms, and sand from the parking lot and the field grinds those lines into whatever is on the floor. Vinyl tile wears through, the wax program can’t keep up, and a painted floor shows a path within a season.

A thick resinous system with a hard topcoat stands up to that abrasion far better than a thin coating or waxed tile. For main corridors we usually look at a flake or quartz broadcast, because the texture hides daily wear and the topcoat takes the grit. The hallways outside the gym get the same treatment: that’s the circulation path where students come off the court in sneakers and water bottles get spilled. We don’t coat the wood court itself. That’s a different floor and a different trade.

It also changes the custodial calendar. Waxed tile hallways get stripped and refinished on a cycle, often every summer, which ties up the crew and the building for days. A resinous floor needs an auto scrubber or a mop with a neutral cleaner, plus walk-off mats at the entries to catch the sand before it reaches the corridor. The strip-and-wax week goes away, and the summer crew can spend that time somewhere else in the building.

Cafeterias, Milk Cartons and Folding Tables

A cafeteria floor gets two kinds of punishment. During lunch it’s milk, juice and food on the floor, plus folding tables and benches rolled and dragged into place. After lunch it’s a wet mop or an auto scrubber. Grout and vinyl seams soak up the spills and start to smell by spring. A jointless floor with a slip-resistant topcoat lets custodians clean it in one pass and keeps students on their feet when a tray goes down. Serving lines and dish areas get more texture than the dining floor, since that’s where it stays wet.

Science Labs and Small Spills

Lab floors take small, frequent chemical spills: indicator dyes, stains, dilute acids and bases, and the occasional broken glass. A cured epoxy system resists most of what a school lab uses, and a coved base where the floor meets the casework keeps spills from running underneath. We ask your science department or facilities office for the list of chemicals in use and check it against the manufacturer’s resistance data before choosing the topcoat. A clean, light-colored floor also makes a spill easy to see before someone steps in it.

Restroom Floors That Stop Holding Odor

School restroom odor usually lives in the grout and along the base of the walls. Regrouting buys a few months. Replacing the floor with a one-piece resinous system and an integral cove that runs up the wall removes the joints the smell lives in. Restrooms get a quartz broadcast for grip on a wet floor, the same system we cover on our quartz systems page. Locker rooms off the gym are their own project, and we wrote about them on our locker room page.

Summer Is When the Work Happens

Nobody wants a grinder running during class. Most school flooring gets done over summer break, with winter or spring break used for small spaces like a single restroom or lab. Summer goes fast, though, and floor work lines up behind roofing, painting and every other summer project, so the planning has to happen during the school year. We like to walk the buildings in spring, get the scope approved, and have the order of rooms settled before the last day of school.

Older school slabs can carry moisture, and South Florida groundwater doesn’t help. Every area gets a moisture test before we price it, and a moisture-tolerant primer goes down where the readings call for it. Each area then gets its full cure time before furniture moves back in and staff come back to set up rooms.

Approvals, Submittals and Paper

Schools don’t buy floors the way a shop owner does. A facilities director, a principal, a district office or a private school board may all need to sign off. We put the scope in writing by area: what comes up, how the slab gets prepped and tested, which system goes down, and the product data sheets for each layer. It’s laid out so you can take it to whoever approves it without rewriting it. Every floor carries our 5-year warranty on materials and installation, and that’s in writing too.

FAQs

Facilities Office Questions

What facilities directors and administrators ask before a school floor gets approved.

Can you do the work while school is in session?
Small spaces sometimes, over a weekend or a short break. Corridors, cafeterias and anything big belong in summer, when the building is empty and every area can cure fully.
When should we contact you for a summer install?
During the school year. Walking the buildings in spring and getting the scope approved early leaves summer for the work itself.
Will the floor hold up to corridor traffic?
A thick broadcast system with a hard topcoat holds up to daily foot traffic and grit far better than waxed tile or floor paint. Walk-off mats at the entries help it last.
Is it slippery when the cafeteria floor is wet?
We add slip-resistant texture to the topcoat in cafeterias, serving lines and restrooms, with more grip where the floor stays wet.
Can you coat our science labs?
Yes. Send us the list of chemicals the labs use and we’ll check it against the manufacturer’s resistance data before choosing the topcoat.
Do you coat gym floors?
Not the wood playing court. We coat the concrete around it: corridors, lobbies and the paths students use going in and out of the gym.
What warranty comes with it?
Every 343 Epoxy floor carries a 5-year warranty on materials and installation.
Reviews

Customer Reviews, Copied Exactly

“Best in the business! These guys were a huge part in creating a custom unique epoxy flooring for my detailing trailer, and they absolutely knocked it out of the park! Super good pricing, amazing attention to detail and 5 star customer service. Best in the epoxy business hands down”
Drace Detailing, Google review
“Unbelievable work. Got my garage floor done by Zach from 343 epoxy. Him and his whole team were very professional and punctual. They helped bring my vision to life.”
bryan armas, Google review
Next summer

Plan Next Summer’s Floors

Tell us which buildings and which areas wear out first. Zach will set a walk during the school year and put the scope in writing for your approval process. Call in English or Spanish.