On a hospital job, the engineering department and the infection-control team make the calls, and they should. The floors a coating contractor usually gets are behind the scenes: service corridors, loading docks, mechanical rooms, storage, staff areas and the walkways in the parking structure. That’s the work we bid, and we bid it on your rules.
Where a Coating Crew Belongs
Service Corridors
Linen carts, meal carts, supply carts and a scrubber every night. A jointless floor with a coved base at the wall gives dirt no joint to sit in.
Loading and Receiving
Pallet jacks, hand trucks and deliveries coming in wet. Docks get a heavier build with a broadcast that keeps traction when the floor is damp.
Mechanical Rooms
Pumps, chillers and water heaters leak. Sealed or coated concrete stops dusting, shows a leak early and mops clean.
Garage Walkways
Stair landings, elevator lobbies and pedestrian paths inside the parking structure. Open driving decks are often a membrane job, and we’ll say so.
Phased Work Under Facility Rules
Walk With Engineering
We walk the area with your facilities or engineering staff and write down the scope, the allowed hours and the rules for that part of the building.
Build the Containment Plan
The hospital’s own risk review sets the containment level. We plan barriers, door seals, walk-off mats and dust collection to match it.
Test and Grind
Moisture testing first. Then diamond grinding with vacuum collection, crack and joint repair, and a clean slab before any coating gets opened.
One Phase at a Time
Each section is coated, cured and handed back before the next one closes. You get cure and walk-on times in writing before we start.
Who Decides on a Hospital Floor
We’ll be plain about this. A hospital has people whose job is the building: an engineering or facilities department, an infection-control team, a safety officer, and on bigger projects a design team. They decide what goes on the floor, where it goes and when. We don’t walk in and tell anyone what their floor should be.
What we bring is what they need to make that call. Product data sheets and safety data sheets for every layer, cure schedules, odor information, the moisture test results from your slab, and a written scope that says which rooms, which system and how many phases. If your team has a preferred product or a spec from the architect, we work to it. If something in that spec won’t hold up on the slab we tested, we tell you before the job starts.
Corridors, Docks and Plant Rooms
Patient rooms, operating rooms and other clean areas are usually specified by the hospital’s design team, with products and installers picked for those rooms. When that’s the case, we stay out of it. The floors that come our way are the hard-working ones nobody photographs.
Service corridors take carts all day. There we usually run a 100% solids epoxy with fine aggregate in the topcoat and a coved base up the wall, so the scrubber can reach the corner. Loading docks and receiving take pallet jacks and wet wheels, and a quartz broadcast system holds up well there. Where a back-of-house kitchen or dish area sees hot water washdowns, urethane cement is the first system we look at. Storage and mechanical rooms often need nothing fancier than a grind and seal. Miami slabs carry a lot of moisture, so every one of these starts with a vapor test, and a moisture-mitigating primer goes down where the numbers call for it.
Dust Control in an Occupied Building
Grinding concrete makes dust, and dust in a hospital is a serious problem. Every grinder we run is hooked to a vacuum with HEPA filtration. Past that, the containment for the work area comes from the hospital’s own infection-control risk review. It can range from plastic barriers and sealed doors to full enclosures under negative air. Your team tells us the level. We build to it and keep it up every shift.
Odor matters too. Some coatings smell while they go down and cure, and the air handling in a hospital can carry that smell where you don’t want it. Before we pick a product, we go over its odor and cure with engineering, and whether the return air for that zone gets isolated is their call. We clean up at the end of every shift, take waste out by the route we’re given, and leave the area the way the facility expects to find it.
Exits, Fire Doors and the Firefighter Rule
343 Epoxy is owned by Zach, a firefighter, and the company is named for the 343 firefighters lost on 9/11. So this part is personal. When a corridor is closed for flooring, people still have to be able to get out of the building. The hospital has its own plan for keeping exits usable during construction, and we follow it to the letter.
On the floor that means we phase the work so a path stays open, we never prop or wedge a fire door, and we don’t park a grinder or a pallet of material in an exit route. Fire extinguishers stay at the work area. Solvents and anything flammable get stored where the facility tells us, in the amounts it allows. If a phase plan would block an exit, we redraw the phase. Nobody on our crew debates that one.
Cleaning Chemistry and the 5-Year Warranty
Hospital environmental services teams use strong disinfectants, and some of them are hard on coatings over time. Send us the list of products your team puts on the floor, and we’ll check each one against the chemical resistance data for the topcoat before we recommend it. Day to day, a coated floor takes an auto scrubber and the cleaner your team already uses, with no wax and no stripping. The lanes that wear first can get a fresh topcoat without redoing the system underneath.
Every floor we install carries a 5-year warranty on materials and installation, in writing. We use ChemTek, Smith’s Paints and Floor Guard products and work across Miami-Dade, Broward, Palm Beach and the Florida Keys. For smaller clinical spaces, see our medical office floors page. Call (305) 409-9022, or (305) 310-2827 en espaƱol.
What Engineering Asks Us
Questions from facilities and engineering staff before a floor job goes out.
Do you coat patient rooms or operating rooms?
How do you control grinding dust?
Will the work block an exit route?
Which coatings stand up to hospital disinfectants?
Can you work nights and weekends?
Do you coat parking garage floors?
What does the warranty cover?
Posted by Our Customers
“I had a great experience with 343epoxy from start to finish. Their team was professional, responsive, and incredibly knowledgeable about the entire epoxy process. They took the time to explain my options, helped me choose the perfect finish, and delivered exactly what they promised.”
“Very friendly and customer service is the second to none. Hands-down, one of the best in the business!”
Bring Us Your Scope
Send the area, the hours engineering will allow and the containment level. We’ll walk it with your team and put a system and a phase plan in writing.